A NEW SHED BASE / PLINTH

Shed on stood on pretreated timbers and concrete flags

Tools required :- Spade / shovel, trowel, tape measure, spirit level and hammer. Safety tip :- Wear gloves when mixing mortar and concrete as cement can irritate and burn skin, (See post). To extend the working life of your new or existing shed have a good level base / plinth for it to rest on. Place the appropriate number of flags down {i.e. a 6ft x 4ft shed will require 6 x 2ft x 2ft flags) on level ground. you may have to place them on blobs of concrete or as I prefer a dry mix screed of 4 : 1 sand and cement which will set using the moisture from the ground, (See laying flags … [Read more...]

FITTING A NEW KITCHEN – 4 Where to start

Male and female bolts

  Your new kitchen units have been delivered and the kitchen area is ready for the install, but where do you start ?. The first job to do is check the level of the floor, wherever the highest point is measure up 870mm and mark the wall, this measurement allows 720mm for the base unit and 150mm for the plinth. From your mark draw a level line using your spirit level across the wall(s), this is the guideline for all your base units, now measure up from the 870mm mark to the bottom of your wall units (this measurement is down to personal preference) , I would suggest 400 - 440mm, from this … [Read more...]